Download PRESS RELEASE – URCA Paves the Way for 5G Services in The Bahamas

 

Understanding URCA’s 5G Regulatory Framework, Deployment Requirements and Opportunities for Innovation

The Utilities Regulation and Competition Authority (URCA) has published its Statement of Results and Final Decisions on the Implementation of a 5G Regulatory Framework in The Bahamas (ECS 10/2026), establishing the regulatory foundation for the introduction of fifth-generation (5G) mobile services across the country.

The framework represents a significant milestone in the modernisation of The Bahamas’ electronic communications sector. It is designed to facilitate investment in next-generation mobile networks, improve the quality and reliability of communications services, expand digital connectivity across the Family Islands and create opportunities for technological innovation and economic development.

Following extensive public consultation and engagement with industry stakeholders, URCA has developed a regulatory framework that takes into account the unique geography of The Bahamas, its existing mobile telecommunications market, international technical standards and the evolving connectivity needs of consumers and businesses.

1. What is 5G and what does it mean for The Bahamas?

5G is the fifth generation of mobile telecommunications technology. Building upon existing 4G and LTE networks, 5G offers the potential for significantly improved data speeds, greater network capacity, faster response times and more advanced connectivity solutions.

Potential benefits include:

  • Faster downloads, uploads and access to online services.
  • Improved video streaming, video conferencing and remote working.
  • Greater network capacity in densely populated areas and busy commercial locations.
  • Improved connectivity for remote learning and digital education.
  • Expanded opportunities for telemedicine and connected healthcare services.
  • Smart infrastructure, intelligent transportation and logistics systems.
  • Greater connectivity for tourism, hospitality and financial services.
  • Support for the Internet of Things (IoT), allowing connected devices, sensors and equipment to exchange information more efficiently.
  • New opportunities for digital entrepreneurship and technology-driven businesses.

The introduction of 5G is not simply about faster mobile phones. It provides an opportunity to strengthen the digital infrastructure upon which an increasingly connected Bahamian economy will depend.

2. What is 5G and what does it mean for The Bahamas?

A central objective of URCA’s regulatory framework is to ensure that the benefits of 5G connectivity extend beyond the country’s principal population and commercial centres. Mandatory minimum coverage requirements and deployment milestones will form part of the spectrum licences issued to successful applicants.

Minimum deployment requirements

Location Minimum deployment requirement Timeline
New Providence 90% outdoor population coverage 18 months
Grand Bahama 80% outdoor population coverage 24 months
Initial Family Island deployment Each operator must introduce 5G on at least two designated Family Islands 36 months
Wider Family Island deployment Qualifying coverage across designated areas in all identified major Family Islands 48 months

Swipe horizontally to view all table columns.

Unless otherwise specified, deployment timelines will commence from the effective date of the relevant spectrum grant. The definitive island list, coverage thresholds, geographic assessment areas and operator-specific obligations will be published in the Invitation to Apply (ITA). URCA may approve complementary deployment schedules. Each operator remains individually responsible for its assigned obligations.

Facilitating Family Island connectivity

Operators may utilise infrastructure-sharing and network-sharing arrangements, subject to applicable regulatory requirements. Supporting technologies, including satellite backhaul, may facilitate connectivity where the resulting services satisfy applicable technical and performance requirements. Such arrangements do not automatically replace terrestrial 5G deployment requirements or remove individual licence obligations.

Qualifying investments in underserved or commercially challenging areas may be eligible for reductions under the Communications Licence Fee Reduction Scheme. Further opportunities will be considered through URCA’s work on the Universal Service Framework.

3. Network performance and minimum service standards

Applicants must demonstrate the technical, financial and organisational capability to meet measurable performance, capacity and reliability requirements.

Performance indicator Minimum requirement
Download capability 100 Mbps in designated urban or high-demand areas
Upload capability 50 Mbps in designated urban or high-demand areas
Latency 30 ms or better during initial non-standalone deployment in designated assessment areas
Availability 99.9% annual average, excluding qualifying force majeure events
Backup power Eight hours at 5G base-station sites
Capacity High concentrations of devices in designated high-traffic locations
Security Cybersecurity, network protection and supply-chain risk management
Health and safety Applicable equipment safety and EMF exposure requirements

Swipe horizontally to view all table columns.

Understanding speeds and latency

Download speeds determine how quickly information is received; upload speeds determine how quickly it is transmitted. The minimum speed requirements relate to network capability in designated assessment areas and are not a guarantee of individual speeds everywhere or at all times. Latency is the time information takes to travel through a network. Lower latency supports more responsive applications, including industrial automation and interactive learning.

4. Building stronger and more resilient mobile networks

Network resilience is particularly important in The Bahamas given its exposure to hurricanes, severe weather and electricity outages. Operators must provide at least eight hours of backup power at 5G base-station sites and appropriate redundancy and failover for critical network functions.

Enhanced resilience commitments include:

  • 24 hours of backup power at 50% or more of active 5G sites.
  • 48 hours of backup power at 70% or more of active sites, enhanced redundancy and mean time to repair of 24 hours or less for defined major outages.
  • 72 hours of backup power at designated critical sites under the highest commitment level, geographically diverse core/backhaul redundancy and mean time to repair of 12 hours or less for defined priority restoration events.

These enhanced requirements are not universal minimum obligations. Where offered and accepted, they become binding licence conditions.

5. Radio spectrum for 5G in The Bahamas

Radio spectrum refers to frequencies used to transmit wireless communications signals. URCA has identified two frequency bands for the initial assignment.

Low-band spectrum: 600 MHz (n71)

Low-band spectrum offers favourable propagation characteristics, supporting wider geographic coverage, improved signal penetration into buildings and connectivity in less densely populated communities. Assignment remains subject to international coordination requirements, including protection of broadcasting services in neighbouring countries.

Mid-band spectrum: 3.5 GHz (n78)

Mid-band spectrum balances coverage and capacity, supporting high-speed services in urban, commercial and high-demand areas. Subject to necessary spectrum relinquishment and regulatory processes, URCA has identified two nominal 100 MHz Time Division Duplex (TDD) blocks:

Block Frequency range Nominal bandwidth
A 3400–3500 MHz 100 MHz
B 3600–3700 MHz 100 MHz

Swipe horizontally to view all table columns.

TDD uses different time intervals for downloading and uploading within the same frequency block. Final usable bandwidth and technical conditions will be specified in the 5G Spectrum Band Plan.

Protecting existing spectrum users

URCA will manage potential interference with satellite communications, broadcasting and radar systems. The 3300–3400 MHz range is excluded from the initial assignment pending further technical assessment and international coordination considerations. The 3700–3800 MHz range is also excluded; future uses will be considered separately.

6. How 5G spectrum will be assigned

URCA has adopted a single-stage managed competitive assignment process, refined following stakeholder consultation. The method has been approved by the Minister responsible for the Electronic Communications Sector pursuant to section 30 of the Communications Act, 2009.

Mandatory minimum requirements

Applicants must satisfy all applicable Annex A requirements on a pass/fail basis, covering deployment, coverage, performance, resilience, security, health and safety, and technical, financial and organisational capability. Enhanced commitments cannot compensate for failing a mandatory requirement.

Enhanced commitments

Applicants must undertake at least one qualifying enhanced commitment under Annex B. Where qualifying applicants request the same available spectrum block, priority is determined through a points-based assessment.

Category Level 1 Level 2 Level 3
Coverage 4 8 12
Performance 3 6 9
Resilience 2 4 6

Swipe horizontally to view all table columns.

The maximum aggregate score is 27 points. Only the highest qualifying level in each category is scored.

7. Encouraging operators to exceed minimum requirements

Enhanced geographic coverage

Operators may commit to increasing outdoor population coverage by at least five percentage points above the applicable minimum, potentially reaching 95% in New Providence and 85% in Grand Bahama, alongside accelerated Family Island deployment or additional qualifying coverage in underserved communities at the highest level.

Enhanced network performance

  • User-experienced download speeds of at least 120 Mbps and upload speeds of at least 60 Mbps in designated urban or high-demand areas.
  • Latency of 25 ms or better during non-standalone deployment and 15 ms or better following standalone deployment, where technically applicable, at higher commitment levels.
  • Additional capacity at designated high-density locations at the highest level.

Commitments must be supported by evidence demonstrating deliverability and will be verified against prescribed technical criteria.

8. Understanding standalone and non-standalone 5G

Non-Standalone 5G (NSA) uses existing 4G infrastructure alongside new 5G radio equipment, allowing operators to make use of existing network investments. Standalone 5G (SA) uses a dedicated 5G core and can support more advanced capabilities, including lower latency and specialised enterprise applications. Operators may transition as readiness and regulatory requirements evolve. No automatic transition deadline has been established.

9. Private 5G networks and opportunities for Bahamian businesses

Private 5G networks can meet the specific connectivity needs of an organisation, industrial facility or defined geographical location. Potential applications include smart resorts, ports, airports, shipyards, healthcare facilities, educational campuses, utility monitoring, warehousing and industrial automation.

Public Network Integrated Non-Public Networks (PNI-NPNs)

These networks operate using the infrastructure and spectrum rights of an authorised mobile network operator. Businesses may work with licensed operators subject to existing regulatory and authorisation requirements, without a mandatory trial period.

Standalone Non-Public Networks (S-NPNs)

These networks operate independently of public mobile network infrastructure. Following consultation with URCA, the Minister has authorised temporary access to Premium Spectrum for controlled trials, subject to applicable requirements. Applications involving Standard Spectrum may be considered under existing arrangements without a general requirement for prior trials.

Trials may be facilitated through the proposed Innovation Reef framework, if adopted, or other applicable authorisation mechanisms. Participation does not automatically confer permanent spectrum rights or wider commercial authorisation. Experience gained will inform future regulatory arrangements.

10. Public health, safety and electromagnetic field exposure

As with existing mobile telecommunications technologies, 5G uses radiofrequency electromagnetic fields (EMF). Operators must comply with internationally recognised exposure limits, including those established by the International Commission on Non-Ionizing Radiation Protection (ICNIRP).

  • Conduct EMF compliance assessments for new 5G sites.
  • Provide assessment results to URCA upon request.
  • Display appropriate safety signage where necessary.
  • Cooperate with URCA in addressing public inquiries and complaints.
  • Comply with applicable equipment safety, environmental and public health requirements.

These safeguards build upon existing Individual Operating Licence obligations. URCA is advancing dedicated EMF Exposure Regulations and will undertake public education initiatives drawing on evidence from internationally recognised scientific and public health organisations, engaging relevant local authorities where appropriate.

11. Telecommunications towers and small-cell installations

The existing Electronic Communications Tower Rules, 2016, provide an adequate regulatory foundation for initial deployment. Small cells can improve coverage and capacity in busy locations. URCA will adopt a proportionate, risk-based approach, with notification requirements developed for installations exceeding specified power thresholds, near sensitive locations such as schools, hospitals or airports, or forming part of large-scale deployments. Applicable equipment approval, safety, property access, sharing and exposure requirements remain in force.

12. Protecting aviation safety

URCA will work with the Civil Aviation Authority Bahamas (CAAB) to minimise potential interference with aircraft radio altimeters, which measure height above the ground. Coordination or exclusion zones will be established around major airports, including Lynden Pindling International Airport and Grand Bahama International Airport. Operators must coordinate with URCA and CAAB before activating base stations within designated zones. Technical safeguards may include power restrictions, antenna adjustments and guard bands.

13. Cybersecurity and network security

Applicants must demonstrate appropriate cybersecurity governance, risk management, network security controls, vendor and supply-chain risk assessment, monitoring and implementation arrangements. URCA will adopt proportionate, risk-based compliance measures, including reporting, self-assessments and independent audits where appropriate.

14. Monitoring compliance and protecting consumers

Mandatory baseline requirements and accepted enhanced commitments will be incorporated into spectrum licences. URCA may verify compliance through coverage assessments, technical testing, inspections, availability and outage reporting, backup power verification, security assessments and monitoring of deployment milestones. Non-compliance may result in regulatory action under the Communications Act, 2009, and applicable licence conditions.

15. What happens next?

Publication of the framework does not mean commercial 5G services are immediately available.

Publication of the 5G Spectrum Band Plan

URCA will publish the frequency bands, spectrum configurations and applicable technical requirements.

Invitation to Apply — first quarter of 2027

URCA intends to issue the ITA during the first quarter of 2027, subject to necessary preparatory steps. It will specify available blocks, eligibility and application procedures, fees, designated islands, coverage and performance requirements, scoring criteria, performance bond arrangements, licence conditions, deadlines and the assignment timetable. Applicants will have an opportunity to seek clarification before submitting binding applications.

Assessment and spectrum assignment

URCA will assess qualification, confirm operator-specific obligations, evaluate enhanced commitments and determine spectrum assignments. Licences or amendments will follow completion of applicable statutory and administrative requirements.

Network deployment and commercial launch

Operators will deploy networks in accordance with approved schedules and licence obligations. Commercial launch timing will depend on network readiness and applicable regulatory requirements.

16. A more connected and digitally enabled Bahamas

The introduction of 5G presents an opportunity to strengthen communications infrastructure, improve consumer connectivity, support business innovation and expand access to digital services across the archipelago. URCA’s framework balances technological advancement and investment with competition, consumer protection, public safety, resilience and efficient spectrum management. URCA will continue to engage stakeholders throughout implementation.

Further information and resources

  • Statement of Results and Final Decisions on the Implementation of a 5G Regulatory Framework in The Bahamas (ECS 10/2026).
  • Annex A: Minimum Baseline Requirements for Initial 5G Spectrum Assignment.
  • Annex B: Enhanced Commitment Framework and Spectrum Allocation Priority.
  • Annex C: Procedures for the Initial 5G Spectrum Assignment Process.
  • 5G Spectrum Band Plan — forthcoming.
  • Invitation to Apply — anticipated in Q1 2027.
  • 5G FAQs and public education resources — to be developed.

Visit www.urcabahamas.bs for further information and updates.

This page provides an informational overview. The full Statement of Results and Final Decisions, applicable legislation, assignment documentation and licence conditions should be consulted for definitive regulatory requirements.